Error message

  • Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home3/memec59d/public_html/lescas/includes/common.inc).
  • Deprecated function: The each() function is deprecated. This message will be suppressed on further calls in menu_set_active_trail() (line 2405 of /home3/memec59d/public_html/lescas/includes/menu.inc).

Select Different Solution Methods

User might want to use more powerful scheduler such as SAM to solve problem which is more complex and larger in scale. This tutorial shows how to run different solution methods (i.e. schedulers) on the user-created Route Sheet problem instances.

  1. Load Route Sheet problem instance, i.e. 2013-1112-1613 problem instance.
  2. View list of schedulers in Default Scheduler Library in Scheduler tab.
  3. Double-click one scheduler method, i.e. SAM scheduler method as shown in Figure.

Selection of SAM Scheduler Method for Route Sheet VRP Instance

  1. Take note of the caption title: CVRP: RouteSheet(2013-1112-1613)(SAM)
  2. Click Schedule button to run SAM solution method on 2013-1112-1613 Route Sheet problem instance.
  3. Routing solution will be generated in Output tab as shown in Figure.

Solution Generated by SAM Solution Method on Route Sheet CVRP Instance